Elegant 5 bedroom villa in Rocío de Nagueles on the Golden Mile
Rocio de Nagüeles, Marbella Golden Mile
€2,495,000- 5 Beds
- 3 Baths
- 410 m²Total
- 578 m²Plot
- 385 m²Built
- 25 m²Terraces
Sale Price
€1,295,000Located in the prestigious Marbella Hill Club, one of the most elegant and established residential communities on Marbella’s Golden Mile, this charming Mediterranean-style semi-detached villa offers an exceptional combination of privacy, character and authentic Andalusian charm.
South-facing and situated on a privileged corner of a quiet cul-de-sac shared with only two other homes, the property enjoys an especially private and peaceful setting, surrounded by lush, mature Mediterranean gardens. The villa stands on a plot of approximately 500 m², providing an extraordinary sense of space, tranquillity and privacy.
From the moment you arrive, the property conveys a pleasant sense of elegance and warmth. A charming entrance hall welcomes you and immediately reflects the villa’s timeless and inviting character.
The main floor offers a spacious and bright living room, with large glazed doors opening directly onto a sunny, partially covered terrace, creating a pleasant connection between the indoor and outdoor spaces. The terrace is perfect both for relaxing and enjoying al fresco dining. Adjacent to the living room is a separate dining area, ideal for family gatherings and entertaining guests.
The fully equipped kitchen also features a practical pantry and laundry area, providing functionality and convenience for everyday living.
The garden level provides direct access to the beautifully maintained private gardens and swimming pool. This floor comprises two bedrooms with en-suite bathrooms, offering privacy and comfort for both family and guests. A third bedroom, currently independent, could easily be converted into a third suite with a straightforward renovation.
All the bedrooms on this floor enjoy direct access to the garden and pool area, creating an especially pleasant setting in which to enjoy the Mediterranean lifestyle.
The outdoor spaces have been designed to make the most of Marbella’s exceptional climate. The property features a covered porch and a barbecue area, perfect for enjoying long lunches and al fresco leisure throughout the year.
The upper floor is home to the master bedroom with an en-suite bathroom, designed as a peaceful private retreat. Its high, vaulted ceilings with wooden beams are a particular highlight, adding considerable character and a pleasant sense of spaciousness. The bedroom also features a dressing room and a large private terrace with open views, an ideal space to relax, read or enjoy the sunshine and surroundings over a morning coffee.
The villa harmoniously combines traditional Andalusian architecture with the amenities required for comfortable living. The high ceilings, generous room proportions and constant connection with the outdoor spaces bring elegance, light and character to the entire property.
Marbella Hill Club is a renowned gated community with controlled access, offering a secure and peaceful environment, with night-time security and tennis courts for the exclusive enjoyment of its residents.
Thanks to its privileged location, attractive outdoor spaces and exceptional level of privacy, this property represents an excellent opportunity to enjoy life on Marbella’s famous Golden Mile, surrounded by nature and within easy reach of everything Marbella has to offer. An ideal retreat both for holidays and for enjoying a Mediterranean lifestyle all year round.
Get to know Marbella’s Golden Mile, with its luxurious residential communities and first-class homes. Discover Marbella’s most exclusive area.

Rocio de Nagüeles, Marbella Golden Mile
€2,495,000Rocio de Nagüeles, Marbella Golden Mile
€2,450,000Marbella Hill Club, Marbella Golden Mile
€1,999,000