Seafront duplex flat with a sleek contemporary design in Bahía del Velerín, Estepona
Bahía del Velerín, Estepona East
€2,995,000- 3 Beds
- 3 Baths
- 232 m²Total
- 154 m²Built
- 78 m²Terraces
Sale Price
€1,795,000
Exclusive duplex penthouse on the beachfront with spectacular panoramic views of the sea and Gibraltar, located in the prestigious Cabo Bermejo development, right in the heart of the New Golden Mile, one of the most sought-after and established residential areas on the Costa del Sol.
Situated within one of the most select gated communities on the coast, it offers a secure and private environment with 24-hour security and concierge service. Residents enjoy comprehensive five-star resort-style facilities, including several outdoor pools surrounded by lush tropical gardens, a spa, a fully equipped gym, and direct access to the promenade and the beach, allowing for an exclusive lifestyle all year round.
The property, distributed over two levels, boasts 186 m² of interior space and 115 m² of terraces. This exclusive duplex penthouse has been designed to offer spaciousness, brightness, and maximum comfort, combining elegance, functionality, and excellent quality in every area.
On the main floor, an elegant entrance hall leads to a spacious open-plan area that integrates the living room, dining room, and kitchen in a harmonious layout. The American-style kitchen, fully renovated and equipped with high-end appliances, features a practical central island that combines functionality with contemporary design. The living room opens directly onto a large terrace, perfect for enjoying breakfasts by the sea, gatherings with guests, or relaxed evenings at sunset with open views of the Mediterranean.
On this same floor, there are two generously sized bedrooms. One of them has an en-suite bathroom, a large walk-in closet, and direct access to the main terrace, enjoying pleasant sea views. The second bedroom features a private terrace and abundant natural light. An additional bathroom and a laundry area complete this level, ensuring maximum comfort for daily living.
The upper floor houses the impressive master suite, conceived as a true private retreat. Its high vaulted ceilings add character and spaciousness, while the large walk-in closet and elegant en-suite bathroom enhance the sense of exclusivity.
The suite offers access to two private terraces: the main one, south-facing, provides unbeatable panoramic sea views and features an outdoor kitchen in the porch area, ideal for al fresco dining under the Mediterranean sky; the second, more intimate terrace, is a versatile space with multiple possibilities, such as a wellness area, private gym, or relaxation area with open mountain views.
Notable features include underfloor heating, air conditioning with individualized control via home automation, and excellent construction finishes.
The property also includes a private parking space and a storage room in the underground communal garage.
Located just minutes from the center of Estepona and with excellent connections to Marbella and Puerto Banús, this property represents an exceptional opportunity both as a permanent or holiday residence and as an investment, as it holds a tourist rental license in one of the most coveted beachfront locations in southern Europe.
Bahía del Velerín, Estepona East
€2,995,000Cabo Bermejo, Estepona East
€2,995,000Bahía del Velerín, Estepona East
€2,695,000